Firth Concrete Ltd: 1992 A 23m long pre-stressed hollow concrete pole is being supplied to TransPower New Zealand Ltd and is stress tested and bent over 1m as part of Firth's stringent quality standards
Object Detail
Level
Item
Description
Fletcher Challenge News 1992, Firth Leading by Design brochure, p9, Fletcher Challenge Three New Shares Document
Date range
1992